1
/
of
6
NEW - Vesgantti TWIN XL Mattress, 10 Inch Hybrid Mattress with Memory Foam & Pocket Spring, Ergonomic Design & Pressure Relief, Medium Firm Feel Mattress in a Box (39 x 80 x10 Inches)
NEW - Vesgantti TWIN XL Mattress, 10 Inch Hybrid Mattress with Memory Foam & Pocket Spring, Ergonomic Design & Pressure Relief, Medium Firm Feel Mattress in a Box (39 x 80 x10 Inches)
Regular price
$140
Regular price
$259
Sale price
$140
Unit price
/
per
Couldn't load pickup availability
Share
New in vacuum sealed plastic.
About this item
- 【Individual Pocket Spring】-- Supported by hundreds of quality and stainless Individual pocket spring, each spring work independently to offer an all-over and average support to 7 parts of your body (Feet, legs, hips, waist, shoulders, neck, head). Excellent shock-absorption and resilience, cater your vertebral well, help adjust and correct your sleeping posture. Note: Please keep distance when opening the mattress from the plastic packing, as it may have a risk to hit back when restoring.
- 【Vesgantti Luxury Support System】-- Luxury MULTILAYER FOAM AND POCKET SPRING SUPPORT SYSTERM not just providing better support for your body, but also can absorb more pressure come from your body and the spring, providing more buffers for your body. Fully relax your muscles, greatly improve your sleeping quality
- 【Breathable and Healthy】 -- Ultimate luxury slow springback foam made of high density and first-class temperature-sensitive material, comfortable and breathable, can expel the steamy sweat from the contact surface between you and mattress so to keep body comfortable and dry when sleeping
- 【Ultra Quiet】-- Built-in high quality Individual pocket spring and slow springback foam, can effectively absorb the noise and vibration caused by tossing and turning when sleep, no waking up by the noise, not disturb companion and effectively reduce your turning times, let you sleep soundly and peacefully
Item B07KWTXYC5
SKU 5304
