1
/
of
6
NEW - Vesgantti Twin Mattress, 10 Inch Hybrid Twin Size Mattress in a Box, Single Bed Mattress with Memory Foam and Pocket Spring, Ergonomic Design & Pressure Relief, Medium Firm Feel, 39"*75"*10"
NEW - Vesgantti Twin Mattress, 10 Inch Hybrid Twin Size Mattress in a Box, Single Bed Mattress with Memory Foam and Pocket Spring, Ergonomic Design & Pressure Relief, Medium Firm Feel, 39"*75"*10"
Regular price
$130
Regular price
$219
Sale price
$130
Unit price
/
per
Couldn't load pickup availability
Share
New in vacuum sealed plastic.
About this item
- 【Individual Pocket Spring】-- Supported by hundreds of quality and stainless Individual pocket spring, each spring work independently to offer an all-over and average support to 7 parts of your body (Feet, legs, hips, waist, shoulders, neck, head). Excellent shock-absorption and resilience, cater your vertebral well, help adjust and correct your sleeping posture. Note: Please keep distance when opening the mattress from the plastic packing, as it may have a risk to hit back when restoring.
- 【Vesgantti Luxury Support System】-- Luxury MULTILAYER FOAM AND POCKET SPRING SUPPORT SYSTERM not just providing better support for your body, but also can absorb more pressure come from your body and the spring, providing more buffers for your body. Fully relax your muscles, greatly improve your sleeping quality
- 【Breathable and Healthy】 -- Ultimate luxury slow springback foam made of high density and first-class temperature-sensitive material, comfortable and breathable, can expel the steamy sweat from the contact surface between you and mattress so to keep body comfortable and dry when sleeping
- 【Ultra Quiet】-- Built-in high quality Individual pocket spring and slow springback foam, can effectively absorb the noise and vibration caused by tossing and turning when sleep, no waking up by the noise, not disturb companion and effectively reduce your turning times, let you sleep soundly and peacefully
- 【Vacuum Roll Packed】 -- It is delivery, compressed, vacuum sealed and neatly rolled in a box. Smaller size, easy to carry, restore in 10 seconds after unpacking. (Please note: once the mattress open and restore, it cannot be roll back again)
Item B07D54C6MJ
SKU 5813
